ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

what is the largest prime factor of 34
A weather balloon has a volume of 52.5 liters at a temperature of 295 K. The balloon is released and rises to an altitude where the temperature is 252 K. How do
two sisters, jenny and penny, play on the same basketball team. last season they scored a combined total of 458 points. jenny scored 192 of the points. write an
why do people join interest groups?
the form of city government merges executive and legislative functions in single group of officials
two trains leave stations 408 miles apart at the same time and travel toward eachother. one train travels at 95 miles per hour while the other travels at 75 mil
In a parallelogram, one angle is 9 times the size of another. Find the measures of the angles.
Which best describes a likely result for the circulatory system if the heart is weakened? A. Oxygenated blood would not be pumped to the body's cells via the v
whats the integral of 1/X
all answers to how to be a smart risk taker