15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

Which substance will combine with oxygen gas to produce a greenhouse gas? a. Na b. S c. H₂ d. Ne e. C
which expression is equivalent to x^4-y^4?
A car that travels from point A to point B in four hours, and then from point B back to point A in six hours. The road between point A and point B is perfectly
how do i round 3,176 to the nearest thousand
What is the value of x in 15x-10= 20
why did  the volcano explode
What is the value of x in 15x-10= 20
Which of the following is equivalent to 3a + 4b – (–6a – 3b) ? A. 16ab B. –3a + b C. –3a + 7b D. 9a + b E. 9a + 7b
which expression is equivalent to x^4-y^4?
A bottle rocket that was made in science class had a trajectory path that followed the quadratic equation y=-x^2+4x+6. What is the turning point of the rocket's