15 workers working 8hrs a day can complete a piece of work in 20 days. In how many days will 10 workers do it,working 6 hrs a day? please help!!

Respuesta :

ridmitharuka
ridmitharuka ridmitharuka
  • 02-08-2021

Answer:

40 days

Step-by-step explanation:

w1*h1*d1=w2*h2*d

15*8*20=10*6*d

2400=60d

d=2400/60

d=40

Answer Link

Otras preguntas

Select the best answer for the question.1. Groups of words taken from another writer or speaker, placed in " ", and presented asevidence of a subject are called
A folder has been shared with other users and set to read-only. What does this mean for users?
When bankers examine factors such as level of income, length of time on the job and how much debt the borrower has relative to income, which of the C's are the
Between which two ordered pairs does the graph of f(x) = one-halfx2 + x – 9 cross the negative x-axis? Quadratic formula: x = StartFraction negative b plus or m
A (n) ____ is one of earth’s major land ecosystems with its own characteristic Animals, plants, soil, and climate
Match each vocabulary word to its definition. 1. downloading choose not to do something 2. lead time person who sends out unwanted e-mail 3. opt out how l
Message are carried from the eye to the brain by
How did the cotton gin affect Cotton production
An expansion of the insanity defense based on determining that the individual was not criminally responsible if the unlawful act was due to the presence of a ps
1.) In this parallelogram segment EJ is 12, how long is segment EG? 2.) Angle HEF is 110 degress. Find measures of EHG and HGF.