karlrey2763 karlrey2763
  • 04-05-2021
  • Physics
contestada

Calculate the work done if a boy lifts a bag of cement 500N to the floor of a lorry 2.5m above the ground

Respuesta :

hamzaahmeds
hamzaahmeds hamzaahmeds
  • 05-05-2021

Answer:

W = 1250 J = 1.25 KJ

Explanation:

The work done by the boy is due to the change in the position of the cement vertically. Hence, the work done in this case will be equal to the potential energy of the cement:

[tex]W = P.E\\W = mgh[/tex]

where,

W = Work done = ?

mg = W = weight of cement = 500 N

h = height covered = 2.5 m

Therefore,

[tex]W = (500\ N)(2.5\ m)[/tex]

W = 1250 J = 1.25 KJ

Answer Link

Otras preguntas

Why is sodium sulphate hemihydrate called as "Plaster of Paris"?
how do you write 4540 million in standard form?
What were the major causes of WWII? Please include at least 4 answers.
what's another word for over thinking?
Why is sodium sulphate hemihydrate called as "Plaster of Paris"?
in the number 13,407.036 there are two 3's. Explain how the values of the 3's are related.
what's another word for over thinking?
you have a standard deck of 52 cards. you pick one card and then, with out putting the first card back, you pick a second card. what is the probability that bot
What is the least common denominator for 5/6 and 3/8. 3/4 and 6/7
What is the least common denominator for 5/6 and 3/8. 3/4 and 6/7