What technique is used when setup times at a workstation are sequence dependent?

Respuesta :

littleliax0618
littleliax0618 littleliax0618
  • 04-01-2021

Answer:

johnsons rule minimizes total idle time for both machines or work centers. What technique is used when setup times at a workstation are sequence dependent? determine the total time of each job sequence permutation considering the setup time and choose the best (lowest) time.

Explanation:

please mark me as brainliest thank you

Answer Link

Otras preguntas

two identical freight cars roll without friction towards each other on a level track. one car rolls 2 m/s the other 1 m/s. after the cars collide they couple an
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
What is a direct combination reaction?
Was the Gold Rush a good or bad thing for the United States?
What three islands are located off the East African coast
What is a direct combination reaction?
How many minutes are in 36 hours?
If the speed of an object is tripled, its kinetic energy will be
Rewrite the function c(x) =9(x+3) using the distributive property
What is two thirds minus six thirds