Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete
Help plz

Respuesta :

elitrad
elitrad elitrad
  • 03-07-2020

Answer:

% complete

Explanation:

% complete tracks progress (how far done you are, aka completion)

Answer Link
deliaaaxox deliaaaxox
  • 07-07-2020
Percent complete will be used to track progress on task that the user has created :))
Answer Link

Otras preguntas

When loading application software, the operating system is responsible for which of the following?
The perimeter of a basketball court is 90 meters and the length is 6 meters longer than twice the width. What are the length and width? a What is the width? m
Samantha bought flowers at a craft store for $14.02. She also bought 4 packages of glass beads and 2 vases. The vases cost $3.59 each and the total sales tax wa
Malformation of which cytoskeletal structures may be linked to an inability to contract muscle?.
what is 1 and 3/4 x 1 and 1/3
Is Antarctic a dessert why or why not?
WILL GIVE BRAINLIEST!!
A 250-pound person would use a Type 1 ladder even if he were carrying a load with him. true or false
what should be done to remove fruestrations?​
The institutions for which Swift urges reform here include politics and religion. What does he think of the differences that divide people into factions and sec