lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

If Walt can paint 25 feet of fence in an hour, and Joe can paint 35 feet in an hour, how many minutes will it take them to paint a 150-foot fence, if they work
Write a system of equations with a solution (4,–3)
Write a system of equations with a solution (4,–3)
Which of the following organisms can perform alcoholic fermentation? (1) yeast, (2) humans, (3) bacteria. a. 1 and 2 b. 1 and 3 c. 1 only d. 1, 2, and 3
What are the 3 features of a typical seigneurie
Find the value of x.  Round to nearest hundredth if necessary.
Explain how a species can evolve through natural selection.
The height of a rectangular prism with a 20 cm by 12 cm base and a 30 cm diagonal.find the unknown dimension
Which of the following can be considered fossils? a. a 1 billion year-old rock. b. a 1 billion year-old piece of amber. c. a 1 billion year-old piece of amber w
By the mid-1700s, the largest city in the colonies was (A) New York (B) Boston (C) Philadelphia (D) Charleston (E) Wilmington, Delaware