Comparing a static planning budget to actual costs is not a good way to assess whether variable costs are under control. T/F

Respuesta :

Nyctalus
Nyctalus Nyctalus
  • 11-09-2019

Answer: False

Explanation: Static budget refers to that budget which is made for the upcoming period. A static budget incorporates anticipated values of inputs and outputs in it. It does sometimes assumes extreme business environment conditions.

Therefore, it is not feasible to compare the actual budget with the static plan as there is a high chance that both will differ by a high amount.

Hence, the given statement is false.

Answer Link

Otras preguntas

how did native American people in different environments get their food?
the temperature dropped 2*F each hour for 6 hours. What was the total change in temperature?
What is an advantage of using transgenic bacteria to produce human proteins? a. The human proteins produced by transgenic bacteria work better than those produ
a railroad car with a mass of 30,000 kg is moving at 2.0 m/s when it runs into an at-rest freight car with an equal mass. the cara lock together. what is their
"Find the volume of the given prism. Round to the nearest tenth if necessary. "
whats part of the brains system?
A 0.450 kg baseball comes off a bat and goes straight up. At a height of 10.0 m, the baseball has a speed of 24.5 m/s. Determine its mechanical energy at this h
what is a signifcant contrubition from woman and how did it affect us?
Find the total surface area of a trapezoidal prism.
balloon payments are payments that are?